Back
to Top

 
  • Share this page on Facebook
  • Print this page

GU Report 12 - New 40Ar/39Ar geochronology of gold mineralisation in central Victoria: interim report

GU Report 12 - New <sup>40</sup>Ar/<sup>39</sup>Ar geochronology of gold mineralisation in central Victoria: interim report
Category: Gold Undercover Reports Product Code: MP-R-35309
Free

Product Type*
Download
     Download Info.
 
Sector
Which sector do you represent?







Product description:



Previous 40Ar/39Ar geochronological data, as well as problems in data collection and interpretation, were highlighted in an earlier report (see Fu et al., 2007). In the current interim report, we provide a summary of samples selected for 40Ar/39Ar dating analyses and available results to June, 2008, which provide further constraints on the timing of gold mineralisation in central Victoria, Australia. The report covers both 40Ar/39Ar laser probe and step-heating furnace analyses conducted on mineral separates and whole-rock samples, mainly from the Castlemaine – Chewton, Bendigo, Fosterville – Lockington, Malmsbury, Maldon, Ballarat and Woods Point – Walhalla goldfields.

Download The downloadable version of this report is supplied in PDF format.

Bibliographic reference Fu, B., Fairmaid, A.M. & Phillips, D. 2008. New 40Ar/39Ar geochronology of gold mineralisation in central Victoria: interim report, June 2008. GeoScience Victoria Gold Undercover Report 12. Department of Primary Industries.


Related products:

GU Report 19 - New <sup>40</sup>Ar/<sup>39</sup>Ar geochronology of gold deposits in central Victoria: final report GU Report 19 - New 40Ar/39Ar geochronology of gold deposits in central Victoria: final report Free  
Product Type*
Download
Gold Undercover Report Series Gold Undercover Report Series Free  
Product Type*
Download